CTIO
Published on CTIO (http://www.ctio.noao.edu/noao)

CTIO Home > ENR CTIO Blanco 4-m 2015-10-26

ENR CTIO Blanco 4-m 2015-10-26

Date: 
Monday, October 26, 2015
Telescope: 
CTIO Blanco 4-m
Submitter: 
Tim Abbott
Submitter Email: 
tabbott@ctio.noao.edu
Observer Support: 
Hernan Tirado
Night Assistant: 
Alberto Alvarez
Also Present: 
Rolo & Omar by phone
Problems: 

None, everything behaved as it should.

Comments: 

First part of night spent testing the new non-sidereal tracking - observed 3 fast asteroids without problems producing nice, round, star-like images of the asteroids and suitably elongated streaks of stars.  Rolo and Omar deserve applause for developing and integrating a new trajectory engine into the TCS.  It worked flawlessly.

From 01:40am CDT, took Hysteresis Map (not the control map).  Image numbers 487705-487896.  Defocussed 1500microns, AOS off, 4MAP in test mode.  These are good data for investigating axial hysteresis in the M1 radial supports.

 

Conditions: 
General Conditions
Comment: 
None.
1st Quarter
Clouds: 
Cirrus
Wind: 
Medium
Seeing Value: 
1.70
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky : 
4
2nd Quarter
Clouds: 
Cirrus
Wind: 
Medium
Seeing Value: 
1.50
Seeing Variability: 
0.2
Seeing Source: 
The Telescope I used
Sky: 
2
3rd Quarter
Clouds: 
Clear
Wind: 
Medium
Seeing Value: 
0.00
Seeing Variability: 
0
Seeing Source: 
CTIO Seeing monitor
Sky: 
0
4th Quarter
Clouds: 
Cirrus
Wind: 
Medium
Seeing Value: 
0.00
Seeing Variability: 
0
Seeing Source: 
CTIO Seeing monitor
Sky: 
2
  • Delete
  • Edit
Program: 
Proposal: 
2013A-9999
Target of Oportunity: 
No
Time Observed: 
0.0
Time Engineering: 
8.75
Time lost technical: 
0.0
Time lost weather: 
0.0
Time lost other: 
0.0
Description: 
DECam engineering prop-id, but actually Blanco T&E work
Primary Investigator: 
Alistair Walker
Email: 
awalker@ctio.noao.edu [1]
Institution: 
NOAO
Instrument: 
CTIO 4m DECam
Organization: 
NOAO
Total Program Time: 
8.75
  • Delete [2]
  • Edit [3]
  • Add [4]
Total Times Time Observed Time Engineering Time lost technical Time lost weather Time lost other Total Program Time
2015-10-26 0.0 8.75 0.0 0.0 0.0 8.75

Source URL (modified on 10/27/2015 - 05:36): http://www.ctio.noao.edu/noao/node/8691

Links
[1] mailto:awalker@ctio.noao.edu
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2695/delete?destination=print/content/enr-ctio-blanco-4-m-2015-10-26
[3] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2695/edit?destination=print/content/enr-ctio-blanco-4-m-2015-10-26
[4] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/8691?destination=print/content/enr-ctio-blanco-4-m-2015-10-26