SISPI froze during a calibration sequence; configuration failed to remedy, therefore instance was successfully restarted..
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2015-08-24 | 0.0 | 0.0 | 0.0 | 10.75 | 0.0 | 10.75 |
Links
[1] mailto:brad@astro.berkeley.edu
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2549/delete?destination=print/content/enr-ctio-blanco-4-m-2015-08-24
[3] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2549/edit?destination=print/content/enr-ctio-blanco-4-m-2015-08-24
[4] mailto:frieman@fnal.gov
[5] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2550/delete?destination=print/content/enr-ctio-blanco-4-m-2015-08-24
[6] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2550/edit?destination=print/content/enr-ctio-blanco-4-m-2015-08-24
[7] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/8328?destination=print/content/enr-ctio-blanco-4-m-2015-08-24
*Observing Team*
_DES Observers:_ Michael Baumer, Anna Schooneveld
_Telops:_ Claudio Aguilera
_Remote Support:_
*Observing Plan*
# Community observer first half: Director's discretionary
# Mid-night standards
# Turn on ObsTac
# Morning standards (while watching SISPI closely!)
*Conditions*
# Overcast, with rain in the vicinity. Dome remained closed for entire night.
*Accomplishments*
# successful PTC sequence (exposure 467111-477296)
*Narrative*
# Dome closed 1st half of night
# When conditions seemed to be statically bad, we decided to run a PTC sequence.
# 2 failed attempts: forgot to change proposal id and decided to add a flush_vsub, since it was unclear if this had been done, given the 1st half cancellation.
# 3rd attempt failed due to SISPI hang (see eLog) that required restart of SISPI instance.
# Finally successful from exposure 46711 onward.
# Dome remained closed for remainder of night.