Line 1s still on pump; pressure stable at 41 millitorr.
Observer1 computer decided to spontaneously enter shutdown procedure. It was left shutdown, since we didn't need it.
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2015-08-05 | 0.0 | 0.0 | 0.0 | 11.5 | 0.0 | 11.5 |
Links
[1] mailto:cbell@pas.rochester.edu
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2504/delete?destination=print/content/enr-ctio-blanco-4-m-2015-08-05
[3] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2504/edit?destination=print/content/enr-ctio-blanco-4-m-2015-08-05
[4] mailto:frieman@fnal.gov
[5] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2505/delete?destination=print/content/enr-ctio-blanco-4-m-2015-08-05
[6] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2505/edit?destination=print/content/enr-ctio-blanco-4-m-2015-08-05
[7] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/8230?destination=print/content/enr-ctio-blanco-4-m-2015-08-05
DECal scans all night.
DES Night Summary:
Observing Team
DES Observers: Steve Kent, Nick Mondrik, David James, John Rees
Telops: Hernan Tirado, Alberto Alvarez
Observer on deck Katharine Lutz
Remote Support:
Observing Plan
Conditions
Problems
Accomplishments