Line 1s being actively pumped. About 40 millitorr at end of night.
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2015-08-04 | 0.0 | 0.0 | 0.0 | 11.5 | 0.0 | 11.5 |
Links
[1] mailto:djj@ctio.noao.edu
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2501/delete?destination=print/content/enr-ctio-blanco-4-m-2015-08-04
[3] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2501/edit?destination=print/content/enr-ctio-blanco-4-m-2015-08-04
[4] mailto:frieman@fnal.gov
[5] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2502/delete?destination=print/content/enr-ctio-blanco-4-m-2015-08-04
[6] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2502/edit?destination=print/content/enr-ctio-blanco-4-m-2015-08-04
[7] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/8225?destination=print/content/enr-ctio-blanco-4-m-2015-08-04
None. We did dome flats and DECal scans.
DES Night Summary
Observing Team
DES Observers: Steve Kent, Nick Mondrik, David James, John Rees
Telops: Alberto Alvarez, Hernan Tirado
Remote Support:
Observing Plan
Conditions
Problems
Accomplishments