Proposal:
2015A-0322
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
11.25
Time lost other:
0.0
Description:
Blanco DECam bulge Survey
Primary Investigator:
Rich
Email:
Institution:
UCLA
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
11.25
Cloud cover - did not open the dome.