Target of Oportunity:
No
Time Observed:
9.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
SMASH
Primary Investigator:
David Nidever
Institution:
U. Michigan
Instrument:
CTIO 4m DECam
Total Program Time:
9.75
The first half of the night was proposal 2015A-0615 PI McGonegal