Proposal:
2012B-0001
Target of Oportunity:
No
Time Observed:
4.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Institution:
DES
Instrument:
CTIO 4m DECam
Total Program Time:
4.25
None.
Second Half: none
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2015-02-10 | 8.25 | 0.0 | 0.0 | 0.0 | 0.0 | 8.25 |
Links
[1] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2128/delete?destination=print/content/enr-ctio-blanco-4-m-2015-02-10
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2128/edit?destination=print/content/enr-ctio-blanco-4-m-2015-02-10
[3] mailto:belardiclaudia@gmail.com
[4] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2129/delete?destination=print/content/enr-ctio-blanco-4-m-2015-02-10
[5] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/2129/edit?destination=print/content/enr-ctio-blanco-4-m-2015-02-10
[6] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/7243?destination=print/content/enr-ctio-blanco-4-m-2015-02-10
None.