Proposal:
DECam Engineering
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
6.5
Time lost technical:
1.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Engineering program for DECam
Primary Investigator:
Alistair Walker
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
7.5
Engineering night.
New pointing model testing with new hexapod LUTs - successfully completed (see elog #233896).
One set of starflats (g-filter) achieved before thickening cirrus rolled in (see elog #233899).
An interrupted, partially-completed no-filter DECal was achieved (see elog #233902).