Had a shutte failure at 02:17 local time. Shutter reset was successful and data taking resumed at 02:19.
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2014-12-11 | 7.25 | 0.0 | 0.0 | 0.0 | 0.0 | 7.25 |
Links
[1] mailto:Sarah.Sonnett@jpl.nasa.gov
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/1943/delete?destination=print/content/enr-ctio-blanco-4-m-2014-12-11
[3] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/1943/edit?destination=print/content/enr-ctio-blanco-4-m-2014-12-11
[4] mailto:frieman@fnal.gov
[5] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/1944/delete?destination=print/content/enr-ctio-blanco-4-m-2014-12-11
[6] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/1944/edit?destination=print/content/enr-ctio-blanco-4-m-2014-12-11
[7] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/6846?destination=print/content/enr-ctio-blanco-4-m-2014-12-11