1st Half:
Observations ceased one-quarter of the way through the night, because DECal lamps were on inside the dome. 25 minutes lost. David James and others did the troubleshooting and resumed operations.
2nd Half
None
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2014-08-15 | 10.5 | 0.0 | 0.5 | 0.0 | 0.0 | 11 |
Links
[1] mailto:djschlegel@lbl.gov
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/1715/delete?destination=print/content/enr-ctio-blanco-4-m-2014-08-15
[3] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/1715/edit?destination=print/content/enr-ctio-blanco-4-m-2014-08-15
[4] mailto:frieman@fnal.gov
[5] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/1716/delete?destination=print/content/enr-ctio-blanco-4-m-2014-08-15
[6] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/1716/edit?destination=print/content/enr-ctio-blanco-4-m-2014-08-15
[7] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/6131?destination=print/content/enr-ctio-blanco-4-m-2014-08-15
Observing Team
DES Observers: David James, Stephen Kent
Telops: Manuel Hernandez, Alberto Alvarez
Remote Support: K. Honscheid, E. Neilson spying
Observing Plan
Conditions
Accomplishments
Problems
Notes for data management