Proposal:
SMASH
Target of Oportunity:
No
Time Observed:
11.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.25
Time lost other:
0.0
Description:
Survey
Primary Investigator:
David Nidever
Institution:
U. Michigan
Instrument:
CTIO 4m DECam
Total Program Time:
11.5
None.