Proposal:
2014A-0613
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
2.0
Time lost other:
0.0
Primary Investigator:
David Rodriguez
Email:
Institution:
Universidad de Chile
Instrument:
CTIO 4m DECam
Organization:
Chile
Total Program Time:
2
Thin cirrus at start of night, which thickened and led to a 1.5 hour closure (observations in prior 0.5 hour was unusuable and had to be repeated).