Afternoon: Attempt to run PTC sequence failed halfway with incomplete FITS files. SISPI was restarted. Will try PTC tomorrow.
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2014-02-04 | 8.5 | 0.0 | 0.0 | 0.0 | 0.0 | 8.5 |
Links
[1] mailto:frieman@fnal.gov
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/1367/delete?destination=print/content/enr-ctio-blanco-4-m-2014-02-04
[3] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/1367/edit?destination=print/content/enr-ctio-blanco-4-m-2014-02-04
[4] mailto:kilic@ou.edu
[5] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/1368/delete?destination=print/content/enr-ctio-blanco-4-m-2014-02-04
[6] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/1368/edit?destination=print/content/enr-ctio-blanco-4-m-2014-02-04
[7] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/5015?destination=print/content/enr-ctio-blanco-4-m-2014-02-04
-------------------- DES -----------------------
Observing Team
DES Observers: Steve Kent, Alex Drlica-Wagner
Telops: Hernan Tirada
Remote Support:
Observing Plan
Half-night plan
Conditions
Accomplishments
Problems tagged as Synopsis_Problem
Minor Problems and Relevant Information
Notes for Data Management
------------------------ END DES -------------------------
2nd half\\\:
Pointing had to be adjusted at the beginning, by approximately 20 arcsecs.