It took some time to coax DECam into life, two separate power cycles of the Monsoon controllers to clear hardware latch-ups and several SISPI restarts. The dry air flow to C5 was increased (33% flow increase), this reduced the measured humidity at the FCM to below 1%. A few SISPI interlocks broke now and then, image builders had to be restarted was the most common. See Elog for details.
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-10-22 | 0.0 | 9.0 | 0.0 | 0.0 | 0.0 | 9 |