Proposal:
2012B-9999 DECam engineering
Target of Oportunity:
No
Time Observed:
2.0
Time Engineering:
6.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam engineering
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
8
Completed:
Observations for Armin Rest
4MAP tests
Pointing map