Proposal:
2012B-9999
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
9.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Engineering
Primary Investigator:
ARW
Instrument:
CTIO 4m DECam
Total Program Time:
9
Engineering Night. Tachometer o-ring replaced during the day. Tracking improved and then tested by German. Pointing now median of 15 arcsec absolute, across the sky, Tested effiociency exposure to exposure with a 2 deg slew in between. Looks like we can set the 5s delay to 0, from a quick analysis by Kevin Reil. Took a symap with donuts on the focal plane and the M1 trim off.