Proposal:
2012B-9999
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
8.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
Engineering
Primary Investigator:
Me
Total Program Time:
8
RA weat tacho had to be cleaned during the night in addition to the normal daytime clean
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2013-01-28 | 0.0 | 8.0 | 0.0 | 0.0 | 0.0 | 8 |
Links
[1] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/683/delete?destination=print/content/enr-ctio-blanco-4-m-2013-01-28
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/683/edit?destination=print/content/enr-ctio-blanco-4-m-2013-01-28
[3] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/3083?destination=print/content/enr-ctio-blanco-4-m-2013-01-28
Did pointing map, hexapod on.
Guiding/Tracking tests
Conformed that telescope is sensitive to relatively low winds.(8-16 mph) use of wind blind stops the buffeting.