Proposal:
2012B-9999
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
8.0
Time lost technical:
3.0
Time lost weather:
0.0
Time lost other:
0.0
Description:
DECam commissioning, TCS pointing map
Primary Investigator:
Any of a cast of hundreds
Email:
Institution:
CTIO
Instrument:
CTIO 4m DECam
Organization:
NOAO
Total Program Time:
11
