Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
8.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
thenry88@gsu.edu [1]
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
8.5

Completed the program. Last integration ended with the Sun at -11.2 degrees of elevation.
RKS0804+1217 have a fainter companion SW of target: out of the fiber.