Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
10.5
Time Engineering:
0.0
Time lost technical:
0.5
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
11
22:20 CLT 01:20 UT lost the pointing; lost time recovering it.
The last integration was completed with the Sun at -9.2 degrees of elevation.
One target is pending: RKS0523-0119