Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
11.5
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Total Program Time:
11.5
None.
Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
---|---|---|---|---|---|---|
2023-06-21 | 0.0 | 0.0 | 0.0 | 11.5 | 0.0 | 11.5 |
Links
[1] mailto:thenry@astro.gsu.edu
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/42630/delete?destination=print/content/enr-ctio-15-m-2023-06-21
[3] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/42630/edit?destination=print/content/enr-ctio-15-m-2023-06-21
[4] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/20584?destination=print/content/enr-ctio-15-m-2023-06-21
The dome remained closed because it was overcast.