Target of Oportunity:
No
Time Observed:
10.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
10
Program completed successfully. Since I had some time I repeated the last target (CPD-417746).
DIMM worked tonight!
Please disregard image 1143 it's an extra ThAr taken at the wrong coordinates.