Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
9.25
Time Engineering:
0.0
Time lost technical:
0.5
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
9.75
DIMM data gap: 01:13 - 02:42 UT
09:05 UT a smooth earthquake, it did not impact the integration (file 1147.)
Completed the program with the Sun at -12.4 degrees of altitude.