Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
9.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
9.75
DIMM data gap: 01:25 - 02:54 UT. Seeing reached 3.1["]
Completed the program with the Sun at -10.8 degrees of altitude.