Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
9.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Total Program Time:
9.75
DIMM data gap: 01:30 - 03:00 UT. RINGSS data gap: 00:15 - 02:45 UT (compared to DIMM.)
Completed the program with the Sun at -8.8 degrees of altitude.