Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
9.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
9.25
RINGSS weird data : 01:37 and 08:02 - 08:06 UT
Added one integration of 'J150958.39-523239.8'
Completed the program with the Sun at -11.2 degrees of altitude.