Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
9.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
9.25
Afternoon calibrations : lamps are BAD (few 'counts', like 'bias') slicer ERROR -62 TIMEOUT.
Rebooted OPTGUI, ok: test lamps (files 1116 to 1120), ok BUT 'few' counts (EMAVGSQ low.)
Completed the program with the Sun at -10.9 degrees of altitude.