Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
8.0
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
8.25
DIMM data gaps 00:00 - 02:09, 03:18 - 06:12 UT. Used Pachon DIMM as a reference.
RKS2353+1206 SE companion as a guider though under bad seeing conditions (blurry *)
No time for RKS0728-5815 and G2K001221, please reschedule.
Last integration ('RKS1107-6457') completed with the Sun at -11.0 degrees of altitude.