Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
10.0
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
10.25
DIMM data gaps : 00:30 - 01:03, 08:08 - 08:25 UT
Added an extra 20' integration of 'TOI-2486' (making time for 'ASASSN-V J053655.85-1322'.)
Many instances of 'dome and telescope out of sync' (objects looking North or big HA.)
Skipped (no time): G2K000409, please reschedule.
TOI-618: got only 1 of the 2 requested 20' exposures (no more time) please reschedule.
Last integration ('gamma Vel') completed with the Sun at -9.2 degrees of altitude.