Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
10.25
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
10.5
Lost ~ 4 hours of DIMM data (clouds). Used Pachon DIMM data to fill on the gaps.
Around 04:45 UT (file 1139) twice the telescope drifts to the West.
GAI2352+0537_gap extra 20' integration (file 1139) to compensate low SNR in 1138.
Skipped (clouds) : RKS0232-7241 and HIP019082, please reschedule.
06:30 UT sync issues between dome and telescope.
Last integration ('gamma Vel') completed with the Sun at -8.7 degrees of altitude.