Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
9.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.75
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
10.5
Intermittent or no DIMM data: 01:24 - 02:34, 08:57 - 09:13 UT
High RH, lost first 45 minutes of night, skipped: T0291517604 and TIC0294768072
G2K000403: tried B' and then 5' on A component.
Ended last integration on 'gamma Vel' with the Sun at -7.4 degrees of altitude.