Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
10.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
10.5
DIMM data gap ~ 01:35 - 01:55 UT.
HR 433 : used the CDS catalog coordinates.
ThAr lamps: decline of counts measured by parameter EMAVGSQ: currently ~ 1.2-1.5E6 'counts'. Weeks ago was ~ 1.6-1.8E6 'counts'.
Skipped: No time for 'RKS0434-4331', please reschedule it.
Completed last integration ('gamma Vel') with the Sun at -7.6 degrees of altitude.