Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
11.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Total Program Time:
11.25
01:07 UT satellite or similar crosses 'over' object/fiber.
04:30 NOS 'connects' but fails to send calibrations, OPTGUI hangs. Back to manual mode.
Program completed with the Sun at -12.7 degrees of altitude.