Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
11.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
11.25
Thanks to Leonardo P. who fixed the connection between NOS and CHIRON/OPTGUI/TCS.
Around 06:55 UT, connection to ctimac3 failed as reported before. Observing manually.
Program completed with the Sun at -13.3 degrees of altitude.