Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
7.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
4.5
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
11.5
Clouds arrived ~ 03:30 UT. Dome shutter closed at 06:30 UT (overcast.)
Second quarter seeing was in the range 1-5 ["]