Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
10.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
10
Tololo's DIMM is off: seeing values are just references based at the SOAR DIMM monitor.
V5590 Sgr coords are wrong, used those at the CDS: RA = 18 11 3.700 DEC = -27 17 29.43