Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
9.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
9.25
HIP073184 file 1149 integration of 900[s], system went beyond SNR max limit.
HD 135160 file 1155 moved W out of guiding box but extra file 1156 is ok.
Completed the program with the Sun at -12 degrees of altitude.