Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
8.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
8.5
07:10 UT a brief power outage with no apparent consequences.
08:02 While on GAI0915+1414_gap, a brief, smooth earthquake.
Some thin clouds due North at the very end of the night, otherwise it was clear.
Completed last integration with the Sun at -11.5 degrees of altitude.