Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
8.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
8.5
T0446370039 needs to be reschedule, because we got one 1500 [s] integration which ended with the Sun at -8.0 degrees of altitude.