Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
10.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Total Program Time:
10

Tololo weather station down at 02:57 UT.
BP Tau, typo in RA? used CDS coordinates: RA = 04 19 15.834 DEC = +29 06 26.93