Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
11.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
11.5

G2K001327 can't resolve fainter component, seeing ~ 1.7["].
G2K001575 ~ 00:27 UT a small earthquake. And integration did not stop at set EM limit.
4th Quarter, low altitude clouds due North, high wind: seeing reached 3.3["]
Completed the program with Sun at -8.3 degrees of altitude.