Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
10.5
Time Engineering:
0.0
Time lost technical:
1.5
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
12

DIMM down most of the night (N wind), seeing between ~ 4 and 1.0 ["] (started really bad.)
File 1118, ThAr NOT requested looks like a bias. Instead 'lamp_check' says 'Slicer_iout'. ?
Skipped (time!) please reschedule: HR5049, G2K001598, 120247528, TYC_7015-00985-1.
Dome North lamp is broken. A/C unit have a 'pitch' sound and smells a bit strange.