Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
10.25
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
2.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
12.25

Files 1119, 1120, 1123, 1135,1164 ThAr Slicer few counts (EMAVGSQ ~ 43, 64, 26, 460,48): JUNK.
Then, used Pi_LAMPS.vi and: files 1121, 1124, 1136, 1165: OK.
Intermittent DIMM, down in 22:49-23:03, 23:12-23:42, 05:53- ?? UT etc.
- -> ~ 04:30 UT, fast moving thin clouds from SE. Around 05:50 UT cirrus to partially cloudy.
~ 06:05 UT Tololo weather station down.
- Poor weather, S/N ratio ... better to reschedule ?: `PNG 026.1-17.6', 'WT0766B', 'TIC147201138'..
~ 08:45 UT Tried but OVERCAST: 'T0290403522', 'GAI2321-1651_gap', 'TIC303317324'.
- Apparently dome North Wall Lights are broken.
- The dome's sound "hard", "heavier" than usual (compressor sounds like a leakage?)