Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
0.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
11.75
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
11.75

Leonardo focused CHIRON, is just pending to know if it is needed to re-align the optical fiber at the FEM.
All night lost due to overcast and high humidity (~92%.)