Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
8.75
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
9

-01:00 UT Fails to START integration on TOI-2447. Rebooted OPTGUI, did not help, complains of DHE comm issue. 2nd, reboot, ok. It fails again at 02:00 UT, recovered with a new reboot of OPTGUI.
- 04:14 UT DIMM reports a 0.17" seeing: might be a failure. Later DIMM went down between 04:08 and 04:52 UT.
- 06:00 UT According to NOS (line #35) T0400799224 is a FIBER but NOS requests ThAr slicer lamps (=><=); then noted that binning did not changed as expected and mode is reported UNDEF so, stopped the integrations because Last Async Error reports Geometry Error and found binning is 3*1 and not 4*4. Rebooted OPTGUI, again. Apparently OK though Async Error still reports a diff error this time related to the EM meaning it was OFF, fixed it. Please CHECK the program: I added one ThAr Fiber lamp to make sense to the object.
Guess is better to reschedule object T0400799224, program 576.
- Last integration completed with the Sun at -9.7 degrees of elevation.