
- 06:30 UT fails to START exposure on T0190496853: PRESET UNDEF, NOS reSEND fails to connect to TCS. Rebooted OPTGUI, OK, now NOS reSEND connects to TCS and integration STARTed correctly.
- NOS line #37 reached OPTGUI but did not reach the TCS: sent that manually.
- Object delta Cir unreachable (dome limits); reachable at second try.
| Total Times | Time Observed | Time Engineering | Time lost technical | Time lost weather | Time lost other | Total Program Time |
|---|---|---|---|---|---|---|
| 2021-01-04 | 8.25 | 0.0 | 0.25 | 0.0 | 0.0 | 8.5 |
Links
[1] mailto:thenry@astro.gsu.edu
[2] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/33289/delete?destination=print/content/enr-ctio-15-m-2021-01-04
[3] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/33289/edit?destination=print/content/enr-ctio-15-m-2021-01-04
[4] http://www.ctio.noao.edu/noao/field-collection/field-nr-prog/add/node/17395?destination=print/content/enr-ctio-15-m-2021-01-04
Since Tololo and Pachon DIMM seeing monitors are down, tried GEMINI South but is not working either! The DIMM is doomed! Damn!
- Added G2K000950, both components, 540 [s] each (~ 26K counts), + ThAr lamp.
- Completed last integration with the Sun at -9.0 degrees of altitude.