Target of Oportunity:
No
Time Observed:
9.0
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
9

A beautiful night after of seven months of teleworking at home, it is a pleasure to be back on the mountain. My old friends, the 1.5m telescope and CHIRON were amazing tonight, everything was fine, the program was completed successfully. The only issue to report is that we had not data from the DIMM tower.