Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
10.0
Time Engineering:
0.0
Time lost technical:
0.25
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
10.25

03:45 UT Lost dome track because KX Com A/B was not reachable. Pointed to RR Cen instead. Lost 5 min.
No time for target G2k002022. Completed last integration with the Sun at -8 degrees altitude.