Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
9.75
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
9.75

The program was completed successfully.
1st quarter of night, DIMM down.
07:12 UT Fails to go to "11596" TCS reports LIMITS and disabled dome. It was inside allowed limits. OK in second try.
08:18 UT Fails to reach GJ0618B, stops in DEC, OK in 2nd try.