Proposal:
K Kids
Target of Oportunity:
No
Time Observed:
8.5
Time Engineering:
0.0
Time lost technical:
0.0
Time lost weather:
0.0
Time lost other:
0.0
Primary Investigator:
Todd Henry
Email:
Institution:
SMARTS
Instrument:
CTIO 1.5m Echelle
Organization:
SMARTS
Total Program Time:
8.5

01:35 UT 45 seconds power outage. Humidity in range 75% - 55% (down then up again.)
Dome rotation produces a sound which, to me, is not smooth.
No time for: HIP036637, VXR 70, HIP036637 ( + 50 minutes ) Ended last integration w/Sun at -10 degrees.